Print This Page

LPS Design Center

Send us the topo map for your next challenging project. We'll show you how E/One can save significantly on upfront and installed costs while offering total reliability with no preventive maintenance. Fields marked in bold are required.

 
Name
 
Title
Company
 
E-Mail
 
Phone
Address
City / State / ZIP
/ /
Country
Pipe type preference for the project (if any)

No preference
SDR-11 PE
SDR-21 PVC
SDR-26 PVC
SCH-40 PVC

Other (please specify)

"C" factor (default is 150)
GPD/unit (default is 200)
Check all that will be provided

Lot layout/plot, with:
Topography
Road right-of-ways
Discharge locations

Discharge type:
Tie-in
Gravity/lift station
Force main
Treatment site
Other (please specify)

Note: A single drawing with the above information is preferred in order to avoid delays.

If discharging into a force main, what is the tie-in pressure?
Size of force main
Additional questions or comments
Project name
Please submit a plot that indicates lots, topo, roads, contours and discharge. File format should be .DWG or .DXF