Print This Page
 
 
3000 Series Lift Stations  
3000 Series Control Panels  
3000 Series Specs  
3000 Series Pump Curves  
Air Release Station  
 
 
Links
2000 Series Grinder Pumps
Download Brochures about E/One Sewer Systems
E/One Sewer System Design Center
E/One Sewer Blog

 

Lateral Kits

E/One's sewer system lateral kits, often called "curb stops" or "check valves," feature all components commonly needed to connect an E/One grinder pump station to the sewer main. Lateral kits are designed to be used with SDR 11 HDPE and Schedule 40 PVC pipes and include necessary fittings for easy field installation.

Downloads:

Download All Lateral Drawings (PDF)

Download All Lateral Drawings (Zipped DXF)

 

Compression (SDR 11)

SDR 11 HDPE Pipe, Arch Style (Drawing # PA1333P03, PDF)

Compression Fitting Instructions (
Drawing # PA1333P04, PDF)

1-1/4" SDR 11 HDPE, Arch Pattern (Drawing #PA1997P01, PDF)

1-1/2" SDR 11 HDPE, Arch Pattern (Drawing #PA1998P01, PDF)

 

Glued (SCH 40)

PVC SCH 40, Arch Style (Drawing #PA1333P05, PDF)


1-1/4" SCH 40, Arch Pattern (Drawing #PA1997P02, PDF)

 

Brass (SIDR 7)

1 1/4" SIDR 7 HDPE Pipe, Arch Pattern (Drawing #PA1329P01, PDF)

1 1/2" SIDR 7 HDPE Pipe, Arch Pattern (Drawing #PA1330P01, PDF)

1 1/4" SIDR 7 HDPE, Minneapolis Pattern (Drawing #PA1331P01, PDF)

1 1/2" SIDR 7 HDPE, Minneapolis Pattern (Drawing #PA1332P01, PDF)


Layout Drawings

Typical Indoor Installation, Showing Lateral (Drawing #LM000111, PDF)

Typical Outdoor Installation (Drawing #LM000112, PDF)


Typical Flushing Connection (Drawing #LM000113, PDF)


Typical Lateral Installation (Drawing #LM000114, PDF)

Typical Drop Connection (Drawing #LM000115, PDF)

Typical Brass Lateral Installation (Drawing #PA1331P01 PDF)

Pack Joint Instructions for Brass Laterals (Drawing #PA1332P01, PDF)


Compression (SDR 11)

SDR 11 HDPE Pipe, Arch Style (Drawing #PA1333P03, Zipped DXF)

Compression Fitting Instructions (Drawing PA1333P04 (Zipped DXF)

SDR 11HDPE, Arch Style (Drawing #PA1333P05, Zipped DXF)

1-1/4" SDR 11 HDPE, Arch Pattern (Drawing #PA1997P01, Zipped DXF)

1-1/2" SDR 11 HDPE, Arch Pattern (Drawing #PA1998P01, Zipped DXF)

 

Glued (SCH 40)

PVC SCH 40 , Arch Style (Drawing #PA1333P05, Zipped DXF)

1-1/4" SCH 40, Arch Pattern (Drawing #PA1997P02, Zipped DXF)

 

Brass (SIDR 7)

1 1/4" SIDR 7 HDPE Pipe, Arch Pattern (Drawing #PA1329P01, Zipped DXF)

1 1/2" SIDR 7 HDPE Pipe, Arch Pattern (Drawing #PA1330P01, Zipped DXF)

1 1/4" SIDR 7 HDPE, Minneapolis Pattern (Drawing #PA1331P01, Zipped DXF)

1 1/2" SIDR 7 HDPE, Minneapolis Pattern (Drawing #PA1332P01, Zipped DXF)

Layout Drawings

Typical Indoor Installation, Showing Lateral (Drawing #LM000111, Zipped DXF)

Typical Outdoor Installation (Drawing #LM000112, Zipped DXF)

Typical Flushing Connection (Drawing #LM000113, Zipped DXF)

Typical Lateral Installation (Drawing #LM000114, Zipped DXF)

Typical Drop Connection (Drawing #LM000115, Zipped DXF)

Typical Brass Lateral Installation (Drawing #PA1331P01, Zipped DXF)

Pack Joint Instructions for Brass Laterals (Drawing #PA1333P01, Zipped DXF)