Grinder pump specifications for E/One's 1000 Series grinder pump stations are available for download as Word docs. Note that there more than one specification, one for the 1000 Series (fiberglass or HDPE tank), one for the 1010F, which is used in high floodplain areas, and one for the 1012s SQUAT Series.
Contents:
1000 Series Specification
1010F (Floodplain) Specification
1012s (SQUAT) Specification
Downloads:
1000 Series Specification (DOC)
1010F (Floodplain) Specification (DOC)
1012s (SQUAT) Specification (DOC)
1000 Series: Semi-Positive Displacement Type Grinder Pump Stations
1.0 GENERAL
1.01 GENERAL DESCRIPTION: The MANUFACTURER shall furnish complete
factory-built and tested grinder pump unit(s), each consisting of a grinder
pump core suitably mounted on an integral stand of stainless steel, electrical
quick disconnect (NEMA 6P), pump removal harness, discharge assembly and
shut-off valve, anti-siphon valve and check valve assembly, electrical
alarm assembly, and all necessary internal wiring and controls. For ease
of serviceability, all pump motor/grinder units shall be of like type
and horsepower throughout the system.
1.02 SUBMITTALS: After receipt of notice to proceed, the MANUFACTURER
shall furnish a minimum of six (6) sets of shop drawings detailing the
equipment to be furnished including dimensional data and materials of
construction. The ENGINEER shall promptly review this data, and return
two (2) copies as accepted, or with requested modifications. Upon receipt
of accepted shop drawings, the MANUFACTURER shall proceed immediately
with fabrication of the equipment.
1.03 MANUFACTURER: Grinder pump stations, complete with all
appurtenances, form an integral system, and as such, shall be supplied
by one grinder pump station manufacturer. The CONTRACTOR shall be responsible
for the satisfactory operation of the entire system. The equipment specified
shall be a product of a company experienced in the design and manufacture
of grinder pumps for specific use in low pressure sewage systems. The
company shall submit detailed installation and user instructions for its
product, submit evidence of an established service program including complete
parts and service manuals, and be responsible for maintaining a continuing
inventory of grinder pump replacement parts. The MANUFACTURER shall provide
a reference and contact list from ten of its largest contiguous grinder
pump installations of the type of grinder pumps described within this
specification.
The MANUFACTURER of the grinder pump station shall be E/One
Corporation (or Proposed Alternate).
Attention is directed to the fact that the drawings and overall system
design are based on a particular piece of equipment from a particular
manufacturer. These specifications are intended to provide guidelines
for standard equipment of a recognized manufacturer who already meets
all the requirements of this specification.
1.03a ALTERNATE EQUIPMENT: In the event that the CONTRACTOR
or another supplier proposes an Alternate to the specified MANUFACTURER,
the ENGINEER recognizes that it will be difficult to conform to certain
details of this Specification due to different manufacturing techniques
or grinder pump station designs. If proposing an Alternate, the CONTRACTOR
(supplier) must submit, no less than 15 business days in advance of the
bid date, a complete description of any changes that will be necessary
to the system design, a complete submittal package as outlined in Section
1.02 SUBMITTALS, a system hydraulic analysis (including pipe sizes, flows,
velocities, retention times and number and location of recommended valves
and cleanouts, if any) based on the proposed pump, a list of exceptions
to this Specification, and demonstration of compliance to Section 1.04
EXPERIENCE CLAUSE of this Specification. This information must be submitted
to the ENGINEER for pre-approval of the alternate equipment being proposed
and determination of compliance with these Contract Documents. If the
equipment differs materially or differs from the dimensions given on the
Drawings, the CONTRACTOR (supplier) shall submit complete drawings showing
elevations, dimensions, or any necessary changes to the Contract Documents
for the proposed equipment and its installation. Pre-approval, if granted,
will be provided in writing by the Engineer to the Contractor (supplier)
at least five business days in advance of the bid date. If the ENGINEER’S
approval is obtained for Alternate Equipment, the Contractor (supplier)
must make any needed changes in the structures, system design, piping
or electrical systems necessary to accommodate the proposed equipment
at the expense of the Contractor (supplier).
1.04 EXPERIENCE CLAUSE: The equipment furnished hereunder
shall be the product of a company experienced in the design and manufacture
of grinder pumps specifically designed for use in low pressure systems.
All manufacturers proposing equipment for this project shall have at least
ten (10) years of experience in the design and manufacture of units of
identical size(s) and performance to the specified units. All manufacturers
proposing equipment for this project must also have not less than five
hundred (500) successful installations of low pressure sewer systems utilizing
grinder pumps of like type to the grinder pumps specified herein. An installation
is defined as a minimum of twenty-five (25) pumps discharging into a common
force main which forms a low pressure sewer system. The contractor (supplier)
proposing alternate equipment shall also submit, as part of the bid schedule,
an installation list with contact person(s), phone number(s) and date(s)
of at least ten (10) installations of the type of pump specified herein
that have been in operation for at least 10 years.
In lieu of this experience clause, the contractor (supplier) of alternate
equipment will be required to submit a five (5) year performance bond
for one hundred (100) percent of the stipulated cost of the equipment
as bid and as shown in the Bid Schedule. This performance bond will be
used to guarantee the replacement of the equipment in the event that it
fails within the bond period.
1.05 OPERATING CONDITIONS: The pumps shall be capable of delivering
15 GPM against a rated total dynamic head of 0 feet (0 PSIG) and 9 GPM
against a rated total dynamic head of 138 feet (60 PSIG). The pump(s)
must also be capable of operating at negative total dynamic head without
overloading the motor(s). Under no conditions shall in-line piping or
valving be allowed to create a false apparent head.
1.06 WARRANTY: The grinder pump MANUFACTURER shall provide
a part(s) and labor warranty on the complete station and accessories,
including, but not limited to, panel and redundant check valve, for a
period of twenty-four (24) months after notice of OWNER’S acceptance,
but no greater than twenty-seven (27) months after receipt of shipment.
Any manufacturing defects found during the warranty period will be reported
to the MANUFACTURER by the OWNER and will be corrected by the MANUFACTURER
at no cost to the OWNER.
1.07 WARRANTY PERFORMANCE CERTIFICATION: As a bid certification
requirement, each bidder shall provide with their bid schedule a Warranty
Performance Certification statement executed by the most senior executive
officer of the grinder pump MANUFACTURER, which certifies a minimum of
a twenty-four (24) month warranty. They must further detail any exclusions
from the warranty or additional cost items required to maintain the equipment
in warrantable condition, including all associated labor and shipping
fees, and certify that the MANUFACTURER will bear all costs to correct
any original equipment deficiency for the effective period of the warranty.
All preventive maintenance type requirements shall be included in this
form as exclusions. These requirements include, but are not limited to,
unjamming of grinder mechanism, unplugging of lines, periodic motor maintenance,
and periodic cleaning of liquid level controls. Should the CONTRACTOR
(supplier) elect to submit a performance bond in lieu of the experience
clause outlined above, this Warranty Performance Certification shall also
be used as a criterion to evaluate the CONTRACTOR’S (supplier’s)
performance over the warranty period. A Warranty Performance Certification
form is included with the bid schedule and must be completed and submitted
as part of the bid package. Bids with incomplete forms or missing forms
will be considered non-responsive.
2.0 PRODUCT
2.01 PUMP: The pump shall be a custom-designed, integral,
vertical rotor, motor driven, solids handling pump of the progressing-cavity
type with a single mechanical seal. The rotor shall be constructed of
stainless steel. Plating on the rotor will not be acceptable due to its
tendency to delaminate. The stator shall be of a specifically compounded
ethylene-propylene synthetic elastomer. The material shall be suitable
for domestic wastewater service. Its physical properties shall include
high tear and abrasion resistance, grease resistance, water and detergent
resistance, temperature stability, excellent aging properties, and outstanding
wear resistance. Buna-N is not acceptable as a stator material because
it does not exhibit the properties as outlined above and required for
wastewater service.
2.02 GRINDER: The grinder shall be placed immediately below
the pumping elements and shall be direct-driven by a single, one-piece
motor shaft. The grinder impeller assembly shall be securely fastened
to the pump motor shaft by means of a threaded connection attaching the
grinder impeller to the motor shaft. Attachment by means of pins or keys
will not be acceptable. The grinder will be of the rotating type with
a stationary hardened and ground stainless steel shredding ring spaced
in close annular alignment with the driven impeller assembly, which shall
carry two hardened type 400 series stainless steel cutter bars.
This assembly shall be dynamically balanced and operate without objectionable
noise or vibration over the entire range of recommended operating pressures.
The grinder shall be constructed so as to eliminate clogging and jamming
under all normal operating conditions including starting. Sufficient vortex
action shall be created to scour the tank free of deposits or sludge banks
which would impair the operation of the pump. These requirements shall
be accomplished by the following, in conjunction with the pump:
1. The grinder shall be positioned in such a way that solids are fed in
an upward flow direction.
2. The maximum flow rate through the cutting mechanism must not exceed
4 feet per second. This is a critical design element to prevent jamming
and as such must be adhered to.
3. The inlet shroud shall have a diameter of no less than 5 inches. Inlet
shrouds that are less than 5 inches in diameter will not be accepted due
to their inability to maintain the specified 4 feet per second maximum
inlet velocity which by design prevents unnecessary jamming of the cutter
mechanism and eliminates blinding of the pump by large objects blocking
the inlet shroud.
4. The impeller mechanism must rotate at a nominal speed of no greater
than 1800 rpm.
The grinder shall be capable of reducing all components in normal domestic
sewage, including a reasonable amount of “foreign objects”,
such as paper, wood, plastic, glass, rubber and the like, to finely divided
particles which will pass freely through the passages of the pump and
the 1-1/4" diameter discharge.
2.03 ELECTRIC MOTOR: As a maximum, the motor shall be a 1
HP, 1725 RPM, 240 Volt 60 Hertz, 1 Phase, capacitor start, ball bearing,
air-cooled induction type with a low starting current not to exceed 30
amperes and high starting torque of 8.4 foot pounds. Inherent protection
against running overloads or locked rotor conditions for the pump motor
shall be provided by the use of an automatic-reset, integral thermal overload
protector incorporated into the motor. This motor protector combination
shall have been specifically investigated and listed by Underwriters Laboratories,
Inc., for the application. Non-capacitor start motors or permanent split
capacitor motors will not be accepted because of their reduced starting
torque and consequent diminished grinding capability. To reduce the potential
of environmental concerns, the expense of handling and disposing of oil,
and the associated maintenance costs, oil-filled motors will not be accepted.
2.04 MECHANICAL SEAL: The pump/core shall be provided with
a mechanical shaft seal to prevent leakage between the motor and pump.
The seal shall have a stationary ceramic seat and carbon rotating surface
with faces precision lapped and held in position by a stainless steel
spring.
2.05 TANK: High Density Polyethylene Construction. The tank
shall be made of high density polyethylene of a grade selected for environmental
stress cracking resistance. Corrugated sections are to be made of a double
wall construction with the internal wall being generally smooth to promote
scouring. Corrugations of outside wall are to be of a minimum amplitude
of 1 1/2" to provide necessary transverse stiffness.
Any incidental sections of a single wall construction are to be a minimum
.250 inch thick. All seams created during tank construction are to be
thermally welded and factory tested for leak tightness. Tank wall and
bottom must withstand the pressure exerted by saturated soil loading at
maximum burial depth. All station components must function normally when
exposed to maximum external soil and hydrostatic pressure.
The tank shall be furnished with PVC inlet flange to accept a 4.50" OD DWV pipe. Tank capacities shall be as shown on the contract drawings.
The tank shall include a lockable cover assembly providing low profile
mounting and watertight capability. Accessway design and construction
shall facilitate field adjustment of station height in increments of 4" or less without the use of any adhesives or sealants requiring cure time
before installation can be completed.
The station shall have all necessary penetrations factory sealed and tested.
No field penetrations shall be acceptable.
Fiberglass Construction. The tank shall consist of a single wall, laminated
fiberglass construction. The resin used shall be of a commercial grade
suitable for the environment. The reinforcing material shall be a commercial
grade of glass fiber capable of bonding with the selected resin. The inner
surface shall have a smooth finish and be free of cracks and crazing.
The exterior tank surface shall be relatively smooth with no exposed fiber
or sharp projections present.
The tank wall and bottom shall be of sufficient thickness and construction
to withstand the imposed loading due to saturated soil at the specified
burial depth for each available tank height. All station components must
function normally when exposed to the external soil and hydrostatic pressures
developed at the specified burial depth. The tank bottom shall be reinforced
with a fiberglass plate extending beyond the tank walls to support concrete
anchoring, as required, to prevent flotation. The tank shall include a
solid fiberglass cover, secured with threaded stainless steel fasteners,
providing low profile mounting. The tank shall also be vented to prevent
sewage gases from accumulating in the tank.
2.06 DISCHARGE HOSE AND DISCONNECT/VALVE: All discharge fittings
and piping shall be constructed of 304 Series stainless steel, polypropylene,
EPDM or PVC. The discharge hose assembly shall include a shut-off valve
rated for 200 psi WOG and a quick disconnect feature to simplify installation
and pump removal. The bulkhead penetration shall be factory installed
and warranted by the manufacturer to be watertight.
2.07 ELECTRICAL QUICK DISCONNECT: The grinder pump unit shall
include a single NEMA 6P electrical quick disconnect (EQD) for all power
and control functions. An integral tube shall allow venting of the control
compartment to assure proper operation of the pressure switch level system.
The grinder pump will be furnished with a length of 6-conductor, 14-gauge,
type-SJOW cable, pre-wired and watertight to meet UL requirements.
2.08 ANTI-SIPHON VALVE: The pump discharge shall be equipped
with a factory-installed, gravity-operated, flapper-type integral anti-siphon
valve built into the discharge assembly. Moving parts will be made of
300 series stainless steel and fabric-reinforced synthetic elastomer to
ensure corrosion resistance, dimensional stability, and fatigue strength.
A nonmetallic hinge shall be an integral part of the flapper assembly,
providing a maximum degree of freedom to ensure proper operation even
at a very low pressure. The valve body shall be injection-molded from
a glass-filled thermoplastic resin. Holes or ports in the discharge piping
are not acceptable anti-siphon devices, due to their tendency to clog
from the solids in the slurry being pumped.
2.09 CHECK VALVE: The pump discharge shall be equipped with a factory
installed, gravity operated, flapper-type integral check valve built into
the discharge assembly. The check valve will provide a full-ported passageway
when open, and shall introduce a friction loss of less than 6 inches of
water at maximum rated flow. Moving parts will be made of a 300 series
stainless steel and fabric reinforced synthetic elastomer to ensure corrosion
resistance, dimensional stability, and fatigue strength. A nonmetallic
hinge shall be an integral part of the flapper assembly providing a maximum
degree of freedom to assure seating even at a very low back pressure.
The valve body shall be an injection molded part made of glass filled
PVC. Ball-type check valves are unacceptable due to their limited sealing
capacity in slurry applications.
Each grinder pump installation shall also include one separate check valve
of the type detailed in this section for installation in the 1 1/4" service lateral between the grinder pump station and the sewer main, preferably
next to the curb stop. The separate check valve shall be provided as a
separate line item in the bid schedule.
2.10 CORE UNIT: The grinder pump station shall have an easily
removable core assembly containing pump, motor, grinder, all motor controls,
check valve, anti-siphon valve, electrical quick disconnect and wiring.
The watertight integrity of the core unit, shall be established by 100%
factory test at a minimum of 5 PSIG.
2.11 CONTROLS: All necessary controls, including motor and
level controls, shall be located in the top housing of the core unit.
The top housing will be attached with stainless steel fasteners.
Non-fouling wastewater level controls for controlling pump operation shall
be accomplished by monitoring the pressure changes in an integral air
column connected to a pressure switch. The level detection device shall
have no moving parts in direct contact with the wastewater. High-level
sensing will be accomplished in the manner detailed above by a separate
air-bell sensor and pressure switch of the same type. Closure of the high-level
sensing device will energize an alarm circuit as well as a redundant pump-on
circuit. For increased reliability, pump ON/OFF and high-level alarm functions
shall not be controlled by the same switch. Float switches of any kind,
including float trees, will not be accepted due to the periodic need to
maintain (rinsing, cleaning) such devices.
To assure reliable operation of the pressure switches, each core shall
be equipped with a breather assembly, complete with a suitable means to
prevent accidental entry of water into the motor compartment. The grinder
pump will be furnished with a 6 conductor, 14 gauge, type SJOW cable,
pre-wired and watertight to meet UL requirements with a FACTORY-INSTALLED
NEMA 6P EQD half attached to it.
2.12 ALARM PANEL: Each grinder pump station shall include
a NEMA 4X, UL-listed ALARM PANEL suitable for wall mounting. The NEMA
4X enclosure shall be manufactured of thermoplastic to assure corrosion
resistance. The enclosure shall include a hinged, lockable cover, pad
lock, and secured dead front. The enclosure shall not exceed 11.38"W
x13.5"H x 5.63"D.
For each core, the panel shall contain one (1) 15-amp, double-pole circuit
breaker for the power circuit and one (1) 15-amp, single-pole circuit
breaker for the alarm circuit. The panel shall contain terminal blocks,
integral power bus, push to run feature and a complete alarm circuit.
The Alarm Panel shall include the following features: audio & visual
alarm, push to run switch, and high level (redundant) pump starting control.
The alarm sequence is to be as follows:
1. When liquid level in the sewage wet-well rises above the alarm level,
visual and audio alarms will be activated. The contacts on the alarm pressure
switch will close. The redundant pump starting system will be energized.
2. The audio alarm may be silenced by means of the externally mounted,
push-to-silence button.
3. Visual alarm remains illuminated until the sewage level in the wet-well
drops below the “off” setting of the alarm pressure switch.
The visual alarm lamp shall be inside a red fluted lens at least 2 5/8"
in diameter and 1 11/16" in height. Visual alarm shall be mounted
to the top of the enclosure in such a manner as to maintain NEMA 4X rating.
The audio alarm shall be a printed circuit board in conjunction with an
86 dB buzzer with quick mounting terminal strip mounted in the interior
of the enclosure. The audio alarm shall be capable of being deactivated
by depressing a push-type switch which is encapsulated in a weatherproof
silicone boot and mounted on the bottom of the enclosure.
The entire Alarm Panel as manufactured, shall be listed by Underwriters
Laboratories, Inc.
2.13 SERVICEABILITY: The grinder pump core unit shall have
two lifting hooks, complete with nylon lift-out harness, to facilitate
easy core removal when necessary. All mechanical and electrical connections
must provide easy disconnect capability for core unit removal and installation.
A push to run feature will be provided for field trouble shooting. All
motor control components shall be mounted on a readily replaceable bracket
for ease of field service.
2.14 OSHA CONFINED SPACE: All maintenance tasks for the grinder
pump station must be possible without entry into the grinder pump station
(as per OSHA 1910.146 Permit-required confined spaces). “Entry means
the action by which a person passes through an opening into a permit-required
confined space. Entry includes ensuing work activities in that space and
is considered to have occurred as soon as any part of the entrant’s
body breaks the plane of an opening into the space.”
2.15 SAFETY: The grinder pump shall be free from electrical
and fire hazards as required in a residential environment. As evidence
of compliance with this requirement, the completely assembled and wired
grinder pump station in its tank shall be listed by Underwriters Laboratories,
Inc., to be safe and appropriate for the intended use. UL listing of components
of the station or third-party testing to UL standard will not be accepted.
The grinder pump shall meet accepted standards for plumbing equipment
for use in or near residences, shall be free from objectionable noise,
odor, or health hazards, and shall have been tested by an independent
laboratory to certify its capability to perform as specified in either
individual or low pressure sewer system applications. As evidence of compliance
with this requirement, the grinder pump shall bear the National Sanitation
Foundation seal. Third-party testing to NSF standards will not be accepted.
3.0 EXECUTION
3.01 FACTORY TEST: Each grinder pump shall be submerged and
operated for 5 minutes (minimum). Included in this procedure will be the
testing of all ancillary components such as, the anti-siphon valve, check
valve, discharge line and each unit’s dedicated level and motor
controls. All factory tests shall incorporate each of the above listed
items. Actual appurtenances and controls which will be installed in the
field, shall be particular to the tested pump only. A common set of appurtenances
and controls for all pumps will not be acceptable. Certified test results
shall be available upon request showing the operation of each grinder
pump at two (2) different points on its curve, with the maximum pressure
no less than 60 psi. The ENGINEER reserves the right to inspect such testing
procedures with representatives of the OWNER, at the GRINDER PUMP MANUFACTURER’S
facility.
Completed basins shall be factory leak tested to assure the integrity
of all joints, seams and penetrations.
3.02 DELIVERY: All grinder pump units will be delivered to
the job site, 100% completely assembled, including testing, ready for
installation. Grinder pump stations will be individually mounted on wooden
pallets. Grinder pump cores will be shipped in a separate container and
are only required to be installed in the basin.
3.03 INSTALLATION: Earth excavation and backfill are specified
under SITE WORK, but are also to be done as a part of the work under this
section, including any necessary sheeting and bracing. The CONTRACTOR
shall be responsible for handling ground water to provide a firm, dry
subgrade for the structure, and shall guard against flotation or other
damage resulting from general ground water or flooding. The grinder pump
stations shall not be set into the excavation until the installation procedures
and excavation have been approved by the ENGINEER.
Remove packing material. Users instructions MUST be given to the OWNER.
Hardware supplied with the unit, if required, will be used at installation.
The basin will be supplied with a standard field-installed 4" inlet
grommet (fiberglass tank) or flange (for high-density polyethylene tank);
both will accept a 4.50" OD DWV pipe for connecting the incoming
sewer line. Appropriate inlet piping must be used. The basin may not be
dropped, rolled or laid on its side for any reason.
Installation shall be accomplished so that 1" to 4" of accessway,
below the bottom of the lid, extends above the finished grade line. The
finished grade shall slope away from the unit. The diameter of the hole
must be large enough to allow for the concrete anchor.
A 6" inch (minimum) layer of naturally rounded aggregate, clean and
free flowing, with particle size of not less than 1/8" or more than
3/4" shall be used as bedding material under each unit. A concrete
anti-flotation collar, as detailed on the drawings, and sized according
to the manufacturer’s instructions, shall be required and shall
be precast to the grinder pump or poured in place. Each grinder pump station
with its precast anti-flotation collar shall have a minimum of three (3)
lifting eyes for loading and unloading purposes. The unit shall be leveled,
and filled with water, to the bottom of the inlet, to help prevent the
unit from shifting while the concrete is being poured and set. The concrete
must be manually vibrated to ensure there are no voids. If it is necessary
to pour the concrete to a level higher than the inlet piping, an 8" sleeve is required over the inlet prior to the concrete being poured.
The CONTRACTOR will provide and install a four (4) foot piece of four
inch SCH 40 PVC pipe with cap, to stub-out the inlet for the property
owners’ installation contractor, as depicted on the contract drawings.
The electrical enclosure shall be furnished, installed and wired to the
grinder pump station by the CONTRACTOR. An alarm device is required on
every installation, there shall be NO EXCEPTIONS. It will be the responsibility
of the CONTRACTOR and the ENGINEER to coordinate with the individual property
owner(s) to determine the optimum location for the Alarm Panel.
The CONTRACTOR shall mount the alarm device in a conspicuous location,
as per national and local codes. The Alarm Panel will be connected to
the grinder pump station by a length of 6-conductor, 12-gauge, TC-type
cable as shown on the contract drawings. The power and alarm circuits
must be on separate power circuits. The grinder pumps station will be
provided with a minimum of 32', 25' of usable electrical supply cable
outside the station, to connect to the alarm panel. This cable shall be
provided with a FACTORY-INSTALLED EQD half to connect to the mating EQD
half on the core.
3.04 BACKFILL REQUIREMENTS: Proper backfill is essential to
the long-term reliability of any underground structure. Several methods
of backfill are available to produce favorable results with different
native soil conditions. The most highly recommended method of backfilling
is to surround the unit to grade using Class I or Class II backfill material
as defined in ASTM 2321. Class 1A and Class 1B are recommended where frost
heave is a concern; Class 1B is a better choice when the native soil is
sand or if a high, fluctuating water table is expected. Class 1, angular
crushed stone, offers an added benefit in that it doesn’t need to
be compacted.
Class II, naturally rounded stone, may require more compactive effort,
or tamping, to achieve the proper density. If the native soil condition
consists of clean compactible soil, with less than 12% fines, free of
ice, rocks, roots and organic material, it may be an acceptable backfill.
Soil must be compacted in lifts not to exceed one foot to reach a final
Proctor Density of between 85% and 90%. Heavy, non-compactible clays and
silts are not suitable backfill for this or any underground structure
such as inlet or discharge lines.
If you are unsure of the consistency of the native soil, it is recommended
that a geotechnical evaluation of the material is obtained before specifying
backfill.
Another option is the use of a flowable fill (i.e., low slump concrete).
This is particularly attractive when installing grinder pump stations
in augured holes where tight clearances make it difficult to assure proper
backfilling and compaction with dry materials. Flowable fills should not
be dropped more than four feet from the discharge to the bottom of the
hole to avoid separation of the constituent materials.
Backfill of clean, native earth, free of rocks, roots, and foreign objects,
shall be thoroughly compacted in lifts not exceeding 12" to a final
Proctor Density of not less than 85%. Improper backfilling may result
in damaged accessways. The grinder pump station shall be installed at
a minimum depth from grade to the top of the 1 1/4" discharge line,
to assure maximum frost protection. The finish grade line shall be 1"
to 4" below the bottom of the lid, and final grade shall slope away
from the grinder pump station.
All restoration will be the responsibility of the CONTRACTOR. Per unit
costs for this item shall be included in the CONTRACTOR’S bid price
for the individual grinder pump station. The properties shall be restored
to their original condition in all respects, including, but not limited
to, curb and sidewalk replacement, landscaping, loaming and seeding, and
restoration of the traveled ways, as directed by the ENGINEER.
3.05 START-UP AND FIELD TESTING: The MANUFACTURER shall provide
the services of qualified factory trained technician(s) who shall inspect
the placement and wiring of each station, perform field tests as specified
herein, and instruct the OWNER’S personnel in the operation and
maintenance of the equipment before the stations are accepted by the OWNER.
All equipment and materials necessary to perform testing shall be the
responsibility of the OWNER or INSTALLING CONTRACTOR. This will include,
as a minimum, a portable generator (if temporary power is required) and
water in each basin.
The services of a trained factory-authorized technician shall be provided
at a rate of 2 days for each 200 grinder pump stations supplied. Each
day shall be ten (10) person hours in duration.
Upon completion of the installation, the authorized factory technicians
will perform the following test on each station:
1. Make certain the discharge shut-off valve is fully open. This valve
must not be closed when the pump is operating. In some installations,
there may be a valve(s) at the street main that must also be open.
2. Turn ON the alarm power circuit.
3. Fill the wet well with water to a depth sufficient to verify the high
level alarm is operating. Shut off water.
4. Turn ON pump power circuit. Initiate pump operation to verify automatic “on/off” controls are operative. Pump should immediately turn
ON. Within one (1) minute alarm light will turn OFF. Within three (3)
minutes the pump will turn OFF.
Upon completion of the start-up and testing, the MANUFACTURER shall submit
to the ENGINEER the start-up authorization form describing the results
of the tests performed for each grinder pump station. Final acceptance
of the system will not occur until authorization forms have been received
for each pump station installed and any installation deficiencies corrected.
4.0 OPERATION AND MAINTENANCE
4.01 SPARE CORE: The MANUFACTURER will supply one (1) spare
grinder pump core for every 50 grinder pump stations installed, complete
with all operational controls, level sensors, check valve, anti-siphon
valve, pump/motor unit, and grinder.
4.02 MANUALS: The MANUFACTURER shall supply four (4) copies
of Operation and Maintenance Manuals to the OWNER, and one (1) copy of
the same to the ENGINEER.
Back To Top
1010F: Semi-Positive Displacement Type Grinder Pump Stations
1.0 GENERAL
1.01 GENERAL DESCRIPTION: The MANUFACTURER shall furnish complete,
factory-built and -tested grinder pump unit(s), each consisting of a grinder
pump core suitably mounted on an integral stand of stainless steel, electrical
quick disconnect (NEMA 6P), pump removal harness, discharge assembly and
shut-off valve, anti-siphon valve and check valve assembly, electrical
alarm assembly, and all necessary internal wiring and controls. For ease
of serviceability, all pump motor/grinder units shall be of like type
and horsepower throughout the system.
1.02 SUBMITTALS: After receipt of notice to proceed, the MANUFACTURER
shall furnish a minimum of six (6) sets of shop drawings detailing the
equipment to be furnished, including dimensional data and materials of
construction. The ENGINEER shall promptly review this data, and return
two (2) copies as accepted, or with requested modifications. Upon receipt
of accepted shop drawings, the MANUFACTURER shall proceed immediately
with fabrication of the equipment.
1.03 MANUFACTURER: Grinder pump stations, complete with all
appurtenances, form an integral system, and as such, shall be supplied
by one grinder pump station manufacturer. The CONTRACTOR shall be responsible
for the satisfactory operation of the entire system. The equipment specified
shall be a product of a company experienced in the design and manufacture
of grinder pumps for specific use in low pressure sewage systems. The
company shall submit detailed installation and user instructions for its
product, submit evidence of an established service program including complete
parts and service manuals, and be responsible for maintaining a continuing
inventory of grinder pump replacement parts. The MANUFACTURER shall provide
a reference and contact list from 10 of its largest contiguous grinder
pump installations of the type of grinder pumps described within this
specification.
The MANUFACTURER of the grinder pump station shall be E/One
Corporation (or proposed alternate).
Attention is directed to the fact that the drawings and overall system
design are based on a particular piece of equipment from a particular
manufacturer. These specifications are intended to provide guidelines
for standard equipment of a recognized manufacturer who already meets
all the requirements of this specification.
1.03a ALTERNATE EQUIPMENT: In the event that the CONTRACTOR
or another supplier proposes an alternate to the specified MANUFACTURER,
the ENGINEER recognizes that it will be difficult to conform to certain
details of this specification due to different manufacturing techniques
or grinder pump station designs. If proposing an alternate, the CONTRACTOR
(supplier) must submit, no less than 15 business days in advance of the
bid date, a complete description of any changes that will be necessary
to the system design, a complete submittal package as outlined in Section
1.02 SUBMITTALS, a system hydraulic analysis (including pipe sizes, flows,
velocities, retention times and number and location of recommended valves
and cleanouts, if any) based on the proposed pump, a list of exceptions
to this specification, and demonstration of compliance to Section 1.04
EXPERIENCE CLAUSE of this specification. This information must be submitted
to the ENGINEER for pre-approval of the alternate equipment being proposed
and determination of compliance with these contract documents. If the
equipment differs materially or differs from the dimensions given on the
drawings, the CONTRACTOR (supplier) shall submit complete drawings showing
elevations, dimensions, or any necessary changes to the contract documents
for the proposed equipment and its installation. Pre-approval, if granted,
will be provided in writing by the ENGINEER to the CONTRACTOR (supplier)
at least five business days in advance of the bid date. If the ENGINEER’S
approval is obtained for alternate equipment, the CONTRACTOR (supplier)
must make any needed changes in the structures, system design, piping
or electrical systems necessary to accommodate the proposed equipment
at the expense of the CONTRACTOR (supplier).
1.04 EXPERIENCE CLAUSE: The equipment furnished hereunder
shall be the product of a company experienced in the design and manufacture
of grinder pumps specifically designed for use in low pressure systems.
All manufacturers proposing equipment for this project shall have at least
ten (10) years of experience in the design and manufacture of units of
identical size(s) and performance to the specified units. All manufacturers
proposing equipment for this project must also have not less than five
hundred (500) successful installations of low pressure sewer systems utilizing
grinder pumps of like type to the grinder pumps specified herein. An installation
is defined as a minimum of twenty-five (25) pumps discharging into a common
force main, which forms a low pressure sewer system. The CONTRACTOR (supplier)
proposing alternate equipment shall also submit, as part of the bid schedule,
an installation list with contact person(s), phone number(s) and date(s)
of at least ten (10) installations of the type of pump specified herein
that have been in operation for at least 10 years.
In lieu of this experience clause, the CONTRACTOR (supplier) of alternate
equipment will be required to submit a five (5) year performance bond
for one hundred (100) percent of the stipulated cost of the equipment
as bid and as shown in the bid schedule. This performance bond will be
used to guarantee the replacement of the equipment in the event that it
fails within the bond period.
1.05 OPERATING CONDITIONS: The pumps shall be capable of delivering
15 GPM against a rated total dynamic head of 0 feet (0 PSIG) and 9 GPM
against a rated total dynamic head of 138 feet (60 PSIG). The pump(s)
must also be capable of operating at negative total dynamic head without
overloading the motor(s). Under no conditions shall in-line piping or
valving be allowed to create a false apparent head.
1.06 WARRANTY: The grinder pump MANUFACTURER shall provide
a part(s) and labor warranty on the complete station and accessories,
including, but not limited to, panel and redundant check valve, for a
period of twenty-four (24) months after notice of OWNER’S acceptance,
but no greater than twenty-seven (27) months after receipt of shipment.
Any manufacturing defects found during the warranty period will be reported
to the MANUFACTURER by the OWNER and will be corrected by the MANUFACTURER
at no cost to the OWNER.
1.07 WARRANTY PERFORMANCE CERTIFICATION: As a bid certification
requirement, each bidder shall provide with their bid schedule a warranty
performance certification statement executed by the most senior executive
officer of the grinder pump MANUFACTURER, which certifies a minimum of
a twenty-four (24) month warranty. They must further detail any exclusions
from the warranty or additional cost items required to maintain the equipment
in warrantable condition, including all associated labor and shipping
fees, and certify that the MANUFACTURER will bear all costs to correct
any original equipment deficiency for the effective period of the warranty.
All preventive-maintenance-type requirements shall be included in this
form as exclusions. These requirements include, but are not limited to,
unjamming of grinder mechanism, unplugging of lines, periodic motor maintenance,
and periodic cleaning of liquid level controls. Should the CONTRACTOR
(supplier) elect to submit a performance bond in lieu of the experience
clause outlined above, this warranty performance certification shall also
be used as a criterion to evaluate the CONTRACTOR’S (supplier’s)
performance over the warranty period. A warranty performance certification
form is included with the bid schedule and must be completed and submitted
as part of the bid package. Bids with incomplete forms or missing forms
will be considered non-responsive.
2.0 PRODUCT
2.01 PUMP: The pump shall be a custom-designed, integral,
vertical rotor, motor-driven, solids-handling pump of the progressing-cavity
type with a single mechanical seal. The rotor shall be constructed of
stainless steel. Plating on the rotor will not be acceptable due to its
tendency to delaminate. The stator shall be of a specifically compounded
ethylene-propylene synthetic elastomer. The material shall be suitable
for domestic wastewater service. Its physical properties shall include
high tear and abrasion resistance, grease resistance, water and detergent
resistance, temperature stability, excellent aging properties, and outstanding
wear resistance. Buna-N is not acceptable as a stator material because
it does not exhibit the properties as outlined above and required for
wastewater service.
2.02 GRINDER: The grinder shall be placed immediately below
the pumping elements and shall be direct-driven by a single, one-piece
motor shaft. The grinder impeller assembly shall be securely fastened
to the pump motor shaft by means of a threaded connection attaching the
grinder impeller to the motor shaft. Attachment by means of pins or keys
will not be acceptable. The grinder will be of the rotating type with
a stationary-hardened and -ground stainless steel shredding ring spaced
in close annular alignment with the driven impeller assembly, which shall
carry two hardened, type 400 series stainless steel cutter bars.
This assembly shall be dynamically balanced and operate without objectionable
noise or vibration over the entire range of recommended operating pressures.
The grinder shall be constructed so as to eliminate clogging and jamming
under all normal operating conditions including starting. Sufficient vortex
action shall be created to scour the tank free of deposits or sludge banks
which would impair the operation of the pump. These requirements shall
be accomplished by the following, in conjunction with the pump:
a. The grinder shall be positioned in such a way that solids are fed in
an upward flow direction.
b. The maximum flow rate through the cutting mechanism must not exceed
4 feet per second. This is a critical design element to prevent jamming
and as such must be adhered to.
c. The inlet shroud shall have a diameter of no less than 5 inches. Inlet
shrouds that are less than 5 inches in diameter will not be accepted due
to their inability to maintain the specified 4 feet per second maximum
inlet velocity which by design prevents unnecessary jamming of the cutter
mechanism and eliminates blinding of the pump by large objects blocking
the inlet shroud.
d. The impeller mechanism must rotate at a nominal speed of no greater
than 1800 rpm.
The grinder shall be capable of reducing all components in normal domestic
sewage, including a reasonable amount of “foreign objects,”
such as paper, wood, plastic, glass, rubber and the like, to finely divided
particles that will pass freely through the passages of the pump and the
1-1/4” diameter discharge.
2.03 ELECTRIC MOTOR: As a maximum, the motor shall be a 1
HP, 1725 RPM, 240 Volt 60 Hertz, 1 Phase, capacitor-start, ball bearing,
air-cooled induction type with a low starting current not to exceed 30
amperes and high starting torque of 8.4 foot pounds. Inherent protection
against running overloads or locked rotor conditions for the pump motor
shall be provided by the use of an automatic reset, integral thermal overload
protector incorporated into the motor. This motor protector combination
shall have been specifically investigated and listed by Underwriters Laboratories,
Inc. for the application. Non-capacitor-start motors or permanent-split
capacitor motors will not be accepted because of their reduced starting
torque and consequent diminished grinding capability. To reduce the potential
of environmental concerns, the expense of handling and disposing of oil,
and the associated maintenance costs, oil-filled motors will not be accepted.
2.04 MECHANICAL SEAL: The pump/core shall be provided with
a mechanical shaft seal to prevent leakage between the motor and pump.
The seal shall have a stationary ceramic seat and carbon rotating surface
with faces precision lapped and held in position by a stainless steel
spring.
2.05 TANK: High-Density Polyethylene Construction. The tank shall
be made of high density polyethylene of a grade selected for environmental
stress cracking resistance. Corrugated sections are to be made of a double-wall
construction with the internal wall being generally smooth to promote
scouring. Corrugations of outside wall are to be of a minimum amplitude
of 1 1/2" to provide necessary transverse stiffness.
Any incidental sections of a single wall construction are to be a minimum
.250” thick. All seams created during tank construction are to be
thermally welded and factory-tested for leak tightness. Tank wall and
bottom must withstand the pressure exerted by saturated soil loading at
maximum burial depth. All station components must function normally when
exposed to maximum external soil and hydrostatic pressure.
The tank shall be furnished with PVC inlet flange to accept a 4.50" OD DWV pipe. Tank capacities shall be as shown on the contract drawings.
The station shall be designed for a maximun of 15 feet of flood water
over the cover.
The tank shall include a primed and painted steel cover that provides
low-profile mounting. The cover shall allow no more than 1 cup of water
into the station per hour during a 15-foot flood condition.
The station shall have all necessary penetrations factory sealed and tested.
No field penetrations shall be acceptable.
All discharge piping shall be constructed of reinforced PVC flexible hose
and terminate outside the accessway bulkhead with a PVC, 1-1/4” female solvent-weld fitting. The discharge piping shall include a PVC
slide-face, quick-disconnect assembly rated for 200 psi WOG. The bulkhead
penetration shall be factory-installed and -warranted by the manufacturer
to be watertight.
The tank shall be equipped with an EPDM grommet to accept a 2” DWV
vent pipe. The vent pipe shall extend above the predicted flood level
and shall include a 180-degree bend on the end to prevent infiltration.
This vent pipe and bend shall be supplied by the CONTRACTOR. A perforated,
stainless steel screen and 2” NPT nut, provided by the manufacturer,
shall be threaded onto the end of the 180-degree bend to prevent the vent
from becoming obstructed.
The accessway shall include a single NEMA 6P electrical quick disconnect
(EQD) for all power and control functions, factory installed with accessway
penetrations warranted by the manufacturer to be watertight. The accessway
shall also be vented to prevent sewage gases from accumulating in the
tank.
2.06 DISCHARGE HOSE & DISCONNECT/VALVE: All discharge
fittings and piping shall be constructed of 304 Series stainless steel,
polypropylene, EPDM or PVC. The discharge hose assembly shall include
a shut-off valve rated for 200 psi WOG and a quick-disconnect feature
to simplify installation and pump removal. The bulkhead penetration shall
be factory-installed and -warranted by the manufacturer to be watertight.
2.07 ELECTRICAL QUICK DISCONNECT: The grinder pump unit shall include
a single NEMA 6P electrical quick-disconnect (EQD) for all power and control
functions. An integral tube shall allow venting of the control compartment
to assure proper operation of the pressure switch level system. The grinder
pump will be furnished with a length of 6-conductor, 14-gauge, type-SJOW
cable, pre-wired and watertight to meet UL requirements.
2.08 ANTI-SIPHON VALVE: The pump discharge shall be equipped
with a factory-installed, gravity-operated, flapper-type integral anti-siphon
valve built into the discharge assembly. Moving parts will be made of
300 series stainless steel and fabric-reinforced synthetic elastomer to
ensure corrosion resistance, dimensional stability, and fatigue strength.
A nonmetallic hinge shall be an integral part of the flapper assembly,
providing a maximum degree of freedom to ensure proper operation even
at a very low pressure. The valve body shall be injection-molded from
a glass-filled thermoplastic resin. Holes or ports in the discharge piping
are not acceptable anti-siphon devices, due to their tendency to clog
from the solids in the slurry being pumped.
2.09 CHECK VALVE: The pump discharge shall be equipped with
a factory-installed, gravity-operated, flapper-type integral check valve
built into the discharge assembly. The check valve will provide a full-ported
passageway when open, and shall introduce a friction loss of less than
6 inches of water at maximum rated flow. Moving parts will be made of
a 300 series stainless steel and fabric-reinforced synthetic elastomer
to ensure corrosion resistance, dimensional stability, and fatigue strength.
A nonmetallic hinge shall be an integral part of the flapper assembly,
providing a maximum degree of freedom to assure seating even at a very
low back pressure. The valve body shall be an injection-molded part made
of glass-filled PVC. Ball-type check valves are unacceptable due to their
limited sealing capacity in slurry applications.
Each grinder pump installation shall also include one separate check valve
of the type detailed in this section for installation in the 1-1/4” service lateral between the grinder pump station and the sewer main, preferably
next to the curb stop. The separate check valve shall be provided as a
separate line item in the bid schedule.
2.10 CORE UNIT: The grinder pump station shall have an easily
removable core assembly containing pump, motor, grinder, all motor controls,
check valve, anti-siphon valve, electrical quick disconnect and wiring.
The watertight integrity of the core unit shall be established by 100%
factory test at a minimum of 5 PSIG.
2.11 CONTROLS: All necessary controls, including motor and
level controls, shall be located in the top housing of the core unit.
The top housing will be attached with stainless steel fasteners.
Non-fouling wastewater level controls for controlling pump operation shall
be accomplished by monitoring the pressure changes in an integral air
column connected to a pressure switch. The level detection device shall
have no moving parts in direct contact with the wastewater. High-level
sensing will be accomplished in the manner detailed above by a separate
air-bell sensor and pressure switch of the same type. Closure of the high-level
sensing device will energize an alarm circuit as well as a redundant pump-on
circuit. For increased reliability, pump ON/OFF and high-level alarm functions
shall not be controlled by the same switch. Float switches of any kind,
including float trees, will not be accepted due to the periodic need to
maintain (rinsing, cleaning) such devices.
To assure reliable operation of the pressure switches, each core shall
be equipped with a breather assembly, complete with a suitable means to
prevent accidental entry of water into the motor compartment. The grinder
pump will be furnished with a 6-conductor, 14-gauge, type-SJOW cable,
pre-wired and watertight to meet UL requirements with a FACTORY-INSTALLED
NEMA 6P EQD half attached to it.
2.12 ALARM PANEL: Each grinder pump station shall include
a NEMA 4X, UL-listed alarm panel suitable for wall mounting. The NEMA
4X enclosure shall be manufactured of thermoplastic to assure corrosion
resistance. The enclosure shall include a hinged, lockable cover, padlock,
and secured dead front. The enclosure shall not exceed 11.38"W x
13.5"H x 5.63"D.
For each core, the panel shall contain one (1) 15-amp, double-pole circuit
breaker for the power circuit and one (1) 15-amp, single-pole circuit
breaker for the alarm circuit. The panel shall contain terminal blocks,
integral power bus, push-to-run feature and a complete alarm circuit.
The alarm panel shall include the following features: audio and visual
alarm, push-to-run switch, and high level (redundant) pump starting control.
The alarm sequence is to be as follows:
1. When liquid level in the sewage wet-well rises above the alarm level,
visual and audio alarms will be activated. The contacts on the alarm pressure
switch will close. The redundant pump starting system will be energized.
2. The audio alarm may be silenced by means of the externally mounted,
push-to-silence button.
3. Visual alarm remains illuminated until the sewage level in the wet-well
drops below the “off” setting of the alarm pressure switch.
The visual alarm lamp shall be inside a red fluted lens at least 2-5/8”
in diameter and 1-11/16” in height. Visual alarm shall be mounted
to the top of the enclosure in such a manner as to maintain NEMA 4X rating.
The audio alarm shall be a printed circuit board in conjunction with an
86 dB buzzer with quick-mounting terminal strip mounted in the interior
of the enclosure. The audio alarm shall be capable of being deactivated
by depressing a push-type switch, which is encapsulated in a weatherproof
silicone boot and mounted on the bottom of the enclosure.
The entire alarm panel as manufactured, shall be listed by Underwriters
Laboratories, Inc.
2.13 SERVICEABILITY: The grinder pump core unit shall have
two lifting hooks, complete with nylon lift-out harness, to facilitate
easy core removal when necessary. All mechanical and electrical connections
must provide easy disconnect capability for core unit removal and installation.
A push-to-run feature will be provided for field troubleshooting. All
motor control components shall be mounted on a readily replaceable bracket
for ease of field service.
2.14 OSHA CONFINED SPACE: All maintenance tasks for the grinder
pump station must be possible without entry into the grinder pump station
(as per OSHA 1910.146 Permit-required confined spaces). “Entry means
the action by which a person passes through an opening into a permit-required
confined space. Entry includes ensuing work activities in that space and
is considered to have occurred as soon as any part of the entrant’s
body breaks the plane of an opening into the space.”
2.15 SAFETY: The grinder pump shall be free from electrical
and fire hazards as required in a residential environment. As evidence
of compliance with this requirement, the completely assembled and wired
grinder pump station in its tank shall be listed by Underwriters Laboratories,
Inc., to be safe and appropriate for the intended use. UL listing of components
of the station or third-party testing to UL standard will not be accepted.
The grinder pump shall meet accepted standards for plumbing equipment
for use in or near residences, shall be free from objectionable noise,
odor or health hazards, and shall have been tested by an independent laboratory
to certify its capability to perform as specified in either individual
or low pressure sewer system applications. As evidence of compliance with
this requirement, the grinder pump shall bear the National Sanitation
Foundation seal. Third-party testing to NSF standards will not be accepted.
3.0 EXECUTION
3.01 FACTORY TEST: Each grinder pump shall be submerged and
operated for 5 minutes (minimum). Included in this procedure will be the
testing of all ancillary components such as, the anti-siphon valve, check
valve, discharge line and each unit’s dedicated level and motor
controls. All factory tests shall incorporate each of the above-listed
items. Actual appurtenances and controls, which will be installed in the
field, shall be particular to the tested pump only. A common set of appurtenances
and controls for all pumps will not be acceptable. Certified test results
shall be available upon request showing the operation of each grinder
pump at two (2) different points on its curve, with the maximum pressure
no less than 60 psi. The ENGINEER reserves the right to inspect such testing
procedures with representatives of the OWNER, at the GRINDER PUMP MANUFACTURER’S
facility.
Completed basins shall be factory leak tested to assure the integrity
of all joints, seams and penetrations.
3.02 DELIVERY: All grinder pump units will be delivered to
the job site, 100% completely assembled, including testing, ready for
installation. Grinder pump stations will be individually mounted on wooden
pallets. Grinder pump cores will be shipped in a separate container and
are only required to be installed in the basin.
3.03 INSTALLATION: Earth excavation and backfill are specified
under SITE WORK, but are also to be done as a part of the work under this
section, including any necessary sheeting and bracing. The CONTRACTOR
shall be responsible for handling ground water to provide a firm, dry
subgrade for the structure, and shall guard against flotation or other
damage resulting from general ground water or flooding. The grinder pump
stations shall not be set into the excavation until the installation procedures
and excavation have been approved by the ENGINEER.
Remove packing material. Users instructions MUST be given to the OWNER.
Hardware supplied with the unit, if required, will be used at installation.
The basin will be supplied with a standard field-installed 4" inlet
grommet (fiberglass tank) or flange (for high-density polyethylene tank);
both will accept a 4.50" OD DWV pipe for connecting the incoming
sewer line. Appropriate inlet piping must be used. The basin may not be
dropped, rolled or laid on its side for any reason.
Installation shall be accomplished so that 1" to 4" of accessway,
below the bottom of the lid, extends above the finished grade line. The
finished grade shall slope away from the unit. The diameter of the hole
must be large enough to allow for the concrete anchor.
A 6" (minimum) layer of naturally rounded aggregate, clean and free
flowing, with particle size of not less than 1/8" or more than 3/4"
shall be used as bedding material under each unit. A concrete anti-flotation
collar, as detailed on the drawings, and sized according to the manufacturer’s
instructions, shall be required and shall be precast to the grinder pump
or poured in place. Each grinder pump station with its precast anti-flotation
collar shall have a minimum of three (3) lifting eyes for loading and
unloading purposes. The unit shall be leveled and filled with water, to
the bottom of the inlet, to help prevent the unit from shifting while
the concrete is being poured and set. The concrete must be manually vibrated
to ensure there are no voids. If it is necessary to pour the concrete
to a level higher than the inlet piping, an 8" sleeve is required
over the inlet prior to the concrete being poured.
The CONTRACTOR will provide and install a four (4) foot piece of four-inch
SCH 40 PVC pipe with cap to stub-out the inlet for the property owners’ installation contractor, as depicted on the contract drawings.
The electrical enclosure shall be furnished, installed and wired to the
grinder pump station by the CONTRACTOR. An alarm device is required on
every installation, there shall be NO EXCEPTIONS. It will be the responsibility
of the CONTRACTOR and the ENGINEER to coordinate with the individual property
owner(s) to determine the optimum location for the alarm panel.
The CONTRACTOR shall mount the alarm device in a conspicuous location,
as per national and local codes. The alarm panel will be connected to
the grinder pump station by a length of 6-conductor, 12-gauge, TC-type
cable as shown on the contract drawings. The power and alarm circuits
must be on separate power circuits. The grinder pumps station will be
provided with a minimum of 32', 25' of usable electrical supply cable
outside the station, to connect to the alarm panel. This cable shall be
provided with a FACTORY-INSTALLED EQD half to connect to the mating EQD
half on the core.
3.04 BACKFILL REQUIREMENTS: Proper backfill is essential to
the long-term reliability of any underground structure. Several methods
of backfill are available to produce favorable results with different
native soil conditions. The most highly recommended method of backfilling
is to surround the unit to grade using Class I or Class II backfill material
as defined in ASTM 2321. Class 1A and Class 1B are recommended where frost
heave is a concern; Class 1B is a better choice when the native soil is
sand or if a high, fluctuating water table is expected. Class 1, angular
crushed stone, offers an added benefit in that it doesn’t need to
be compacted.
Class II, naturally rounded stone, may require more compactive effort,
or tamping, to achieve the proper density. If the native soil condition
consists of clean compactible soil, with less than 12% fines, free of
ice, rocks, roots and organic material, it may be an acceptable backfill.
Soil must be compacted in lifts not to exceed one foot to reach a final
Proctor Density of between 85% and 90%. Heavy, non-compactible clays and
silts are not suitable backfill for this or any underground structure
such as inlet or discharge lines.
If you are unsure of the consistency of the native soil, it is recommended
that a geotechnical evaluation of the material is obtained before specifying
backfill.
Another option is the use of a flowable fill (i.e., low slump concrete).
This is particularly attractive when installing grinder pump stations
in augured holes where tight clearances make it difficult to assure proper
backfilling and compaction with dry materials. Flowable fills should not
be dropped more than four feet from the discharge to the bottom of the
hole to avoid separation of the constituent materials.
Backfill of clean, native earth, free of rocks, roots, and foreign objects,
shall be thoroughly compacted in lifts not exceeding 12" to a final
Proctor Density of not less than 85%. Improper backfilling may result
in damaged accessways. The grinder pump station shall be installed at
a minimum depth from grade to the top of the 1 1/4" discharge line
to assure maximum frost protection. The finish grade line shall be 1"
to 4" below the bottom of the lid, and final grade shall slope away
from the grinder pump station.
All restoration will be the responsibility of the CONTRACTOR. Per-unit
costs for this item shall be included in the CONTRACTOR’S bid price
for the individual grinder pump station. The properties shall be restored
to their original condition in all respects, including, but not limited
to, curb and sidewalk replacement, landscaping, loaming and seeding, and
restoration of the traveled ways, as directed by the ENGINEER.
3.05 START-UP AND FIELD TESTING: The MANUFACTURER shall provide
the services of qualified, factory-trained technician(s) who shall inspect
the placement and wiring of each station, perform field tests as specified
herein, and instruct the OWNER’S personnel in the operation and
maintenance of the equipment before the stations are accepted by the OWNER.
All equipment and materials necessary to perform testing shall be the
responsibility of the OWNER or INSTALLING CONTRACTOR. This will include,
as a minimum, a portable generator (if temporary power is required) and
water in each basin.
The services of a trained, factory-authorized technician shall be provided
at a rate of 2 days for each 200 grinder pump stations supplied. Each
day shall be ten (10) person hours in duration.
Upon completion of the installation, the authorized factory technicians
will perform the following test on each station:
1. Make certain the discharge shut-off valve is fully open. This valve
must not be closed when the pump is operating. In some installations,
there may be a valve(s) at the street main that must also be open.
2. Turn ON the alarm power circuit.
3. Fill the wet well with water to a depth sufficient to verify the high
level alarm is operating. Shut off water.
4. Turn ON pump power circuit. Initiate pump operation to verify automatic “on/off” controls are operative. Pump should immediately turn
ON. Within one (1) minute alarm light will turn OFF. Within three (3)
minutes, the pump will turn OFF.
Upon completion of the start-up and testing, the MANUFACTURER shall submit
to the ENGINEER the start-up authorization form describing the results
of the tests performed for each grinder pump station. Final acceptance
of the system will not occur until authorization forms have been received
for each pump station installed and any installation deficiencies corrected.
4.0 OPERATION AND MAINTENANCE
4.01 SPARE CORE: The MANUFACTURER will supply one (1) spare
grinder pump core for every 50 grinder pump stations installed, complete
with all operational controls, level sensors, check valve, anti-siphon
valve, pump/motor unit, and grinder.
4.02 MANUALS: The MANUFACTURER shall supply four (4) copies
of operation and maintenance manuals to the OWNER, and one (1) copy of
the same to the ENGINEER.
1012s: Semi-Positive Displacement Type Grinder Pump Stations
1.01 GENERAL DESCRIPTION: The MANUFACTURER shall furnish complete factory-built and tested grinder pump unit(s), each consisting of a grinder pump core suitably mounted on an integral stand of stainless steel, electrical quick disconnect (NEMA 6P), pump removal harness, discharge assembly and shut-off valve, anti-siphon valve and check valve assembly, electrical alarm assembly, and all necessary internal wiring and controls. For ease of serviceability, all pump motor/grinder units shall be of like type and horsepower throughout the system.
1.02 SUBMITTALS: After receipt of notice to proceed, the MANUFACTURER shall furnish a minimum of six (6) sets of shop drawings detailing the equipment to be furnished including dimensional data and materials of construction. The ENGINEER shall promptly review this data, and return two (2) copies as accepted, or with requested modifications. Upon receipt of accepted shop drawings, the MANUFACTURER shall proceed immediately with fabrication of the equipment.
1.03 MANUFACTURER: Grinder pump stations, complete with all appurtenances, form an integral system, and as such, shall be supplied by one grinder pump station manufacturer. The CONTRACTOR shall be responsible for the satisfactory operation of the entire system. The equipment specified shall be a product of a company experienced in the design and manufacture of grinder pumps for specific use in low pressure sewage systems. The company shall submit detailed installation and user instructions for its product, submit evidence of an established service program including complete parts and service manuals, and be responsible for maintaining a continuing inventory of grinder pump replacement parts. The MANUFACTURER shall provide a reference and contact list from ten of its largest contiguous grinder pump installations of the type of grinder pumps described within this specification.
The MANUFACTURER of the grinder pump station shall be Environment One Corporation (or Proposed Alternate).
Attention is directed to the fact that the drawings and overall system design are based on a particular piece of equipment from a particular manufacturer. These specifications are intended to provide guidelines for standard equipment of a recognized manufacturer who already meets all the requirements of this specification.
1.03a ALTERNATE EQUIPMENT: In the event that the CONTRACTOR or another supplier proposes an Alternate to the specified MANUFACTURER, the ENGINEER recognizes that it will be difficult to conform to certain details of this Specification due to different manufacturing techniques or grinder pump station designs. If proposing an Alternate, the CONTRACTOR (supplier) must submit, no less than 15 business days in advance of the bid date, a complete description of any changes that will be necessary to the system design, a complete submittal package as outlined in Section 1.02 SUBMITTALS, a system hydraulic analysis (including pipe sizes, flows, velocities, retention times and number and location of recommended valves and cleanouts, if any) based on the proposed pump, a list of exceptions to this Specification, and demonstration of compliance to Section 1.04 EXPERIENCE CLAUSE of this Specification. This information must be submitted to the ENGINEER for pre-approval of the alternate equipment being proposed and determination of compliance with these Contract Documents. If the equipment differs materially or differs from the dimensions given on the Drawings, the CONTRACTOR (supplier) shall submit complete drawings showing elevations, dimensions, or any necessary changes to the Contract Documents for the proposed equipment and its installation. Pre-approval, if granted, will be provided in writing by the Engineer to the Contractor (supplier) at least five business days in advance of the bid date. If the ENGINEER’S approval is obtained for Alternate Equipment, the Contractor (supplier) must make any needed changes in the structures, system design, piping or electrical systems necessary to accommodate the proposed equipment at the expense of the Contractor (supplier).
1.04 EXPERIENCE CLAUSE: The equipment furnished hereunder shall be the product of a company experienced in the design and manufacture of grinder pumps specifically designed for use in low pressure systems. All manufacturers proposing equipment for this project shall have at least ten (10) years of experience in the design and manufacture of grinder pumps of identical size(s) and performance to those specified. All manufacturers proposing equipment for this project must also have not less than five hundred (500) successful installations of low pressure sewer systems utilizing grinder pumps of like type to the grinder pumps specified herein. An installation is defined as a minimum of twenty-five (25) pumps discharging into a common force main which forms a low pressure sewer system. The contractor (supplier) proposing alternate equipment shall also submit, as part of the bid schedule, an installation list with contact person(s), phone number(s) and date(s) of at least ten (10) installations of the type of pump specified herein that have been in operation for at least 10 years.
In lieu of this experience clause, the contractor (supplier) of alternate equipment will be required to submit a five (5) year performance bond for one hundred (100) percent of the stipulated cost of the equipment as bid and as shown in the Bid Schedule. This performance bond will be used to guarantee the replacement of the equipment in the event that it fails within the bond period.
1.05 OPERATING CONDITIONS: The pumps shall be capable of delivering 15 GPM against a rated total dynamic head of 0 feet (0 PSIG) and 9 GPM against a rated total dynamic head of 138 feet (60 PSIG). The pump(s) must also be capable of operating at negative total dynamic head without overloading the motor(s). Under no conditions shall in-line piping or valving be allowed to create a false apparent head.
1.06 WARRANTY: The grinder pump MANUFACTURER shall provide a part(s) and labor warranty on the complete station and accessories, including, but not limited to, panel and redundant check valve, for a period of twenty-four (24) months after notice of OWNER’S acceptance, but no greater than twenty-seven (27) months after receipt of shipment. Any manufacturing defects found during the warranty period will be reported to the MANUFACTURER by the OWNER and will be corrected by the MANUFACTURER at no cost to the OWNER.
1.07 WARRANTY PERFORMANCE CERTIFICATION: As a bid certification requirement, each bidder shall provide with their bid schedule a Warranty Performance Certification statement executed by the most senior executive officer of the grinder pump MANUFACTURER, which certifies a minimum of a twenty-four (24) month warranty. They must further detail any exclusions from the warranty or additional cost items required to maintain the equipment in warrantable condition, including all associated labor and shipping fees, and certify that the MANUFACTURER will bear all costs to correct any original equipment deficiency for the effective period of the warranty. All preventive maintenance type requirements shall be included in this form as exclusions. These requirements include, but are not limited to, unjamming of grinder mechanism, unplugging of lines, periodic motor maintenance, and periodic cleaning of liquid level controls. Should the CONTRACTOR (supplier) elect to submit a performance bond in lieu of the experience clause outlined above, this Warranty Performance Certification shall also be used as a criterion to evaluate the CONTRACTOR’S (supplier’s) performance over the warranty period. A Warranty Performance Certification form is included with the bid schedule and must be completed and submitted as part of the bid package. Bids with incomplete forms or missing forms will be considered non-responsive.
2.0 PRODUCT
2.01 PUMP: The pump shall be a custom-designed, integral, vertical rotor, motor driven, solids handling pump of the progressing-cavity type with a single mechanical seal. The rotor shall be constructed of stainless steel. Plating on the rotor will not be acceptable due to its tendency to delaminate. The stator shall be of a specifically compounded ethylene-propylene synthetic elastomer. The material shall be suitable for domestic wastewater service. Its physical properties shall include high tear and abrasion resistance, grease resistance, water and detergent resistance, temperature stability, excellent aging properties, and outstanding wear resistance. Buna-N is not acceptable as a stator material because it does not exhibit the properties as outlined above and required for wastewater service.
2.02 GRINDER: The grinder shall be placed immediately below the pumping elements and shall be direct-driven by a single, one-piece motor shaft. The grinder impeller assembly shall be securely fastened to the pump motor shaft by means of a threaded connection attaching the grinder impeller to the motor shaft. Attachment by means of pins or keys will not be acceptable. The grinder will be of the rotating type with a stationary hardened and ground white cast iron shredding ring spaced in close annular alignment with the driven impeller assembly, which shall carry two hardened type 400 series stainless steel cutter bars.
This assembly shall be dynamically balanced and operate without objectionable noise or vibration over the entire range of recommended operating pressures. The grinder shall be constructed so as to eliminate clogging and jamming under all normal operating conditions including starting. Sufficient vortex action shall be created to scour the tank free of deposits or sludge banks which would impair the operation of the pump. These requirements shall be accomplished by the following, in conjunction with the pump:
1. The grinder shall be positioned in such a way that solids are fed in an upward flow direction.
2. The maximum flow rate through the cutting mechanism must not exceed 4 feet per second. This is a critical design element to prevent jamming and as such must be adhered to.
3. The inlet shroud shall have a diameter of no less than 5 inches. Inlet shrouds that are less than 5 inches in diameter will not be accepted due to their inability to maintain the specified 4 feet per second maximum inlet velocity which by design prevents unnecessary jamming of the cutter mechanism and eliminates blinding of the pump by large objects blocking the inlet shroud.
4. The impeller mechanism must rotate at a nominal speed of no greater than 1800 rpm.
The grinder shall be capable of reducing all components in normal domestic sewage, including a reasonable amount of “foreign objects”, such as paper, wood, plastic, glass, rubber and the like, to finely divided particles which will pass freely through the passages of the pump and the 1-1/4" diameter discharge.
2.03 ELECTRIC MOTOR: As a maximum, the motor shall be a 1 HP, 1725 RPM, 240 Volt 60 Hertz, 1 Phase, capacitor start, ball bearing, air-cooled induction type with a low starting current not to exceed 30 amperes and high starting torque of 8.4 foot pounds. Inherent protection against running overloads or locked rotor conditions for the pump motor shall be provided by the use of an automatic-reset, integral thermal overload protector incorporated into the motor. This motor protector combination shall have been specifically investigated and listed by Underwriters Laboratories, Inc., for the application. Non-capacitor start motors or permanent split capacitor motors will not be accepted because of their reduced starting torque and consequent diminished grinding capability. To reduce the potential of environmental concerns, the expense of handling and disposing of oil, and the associated maintenance costs, oil-filled motors will not be accepted.
2.04 MECHANICAL SEAL: The pump/core shall be provided with a mechanical shaft seal to prevent leakage between the motor and pump. The seal shall have a stationary ceramic seat and carbon rotating surface with faces precision lapped and held in position by a stainless steel spring.
2.05 TANK : Polyethylene Construction: The tank shall be made of rotationally molded polyethylene, with a melt index of 4.0 grams/10 minutes or lower to assure high environmental stress cracking resistance. All seams created during tank construction are to be thermally welded and factory tested for leak tightness. Tank wall and bottom must withstand the pressure exerted by saturated soil loading at maximum burial depth. All station components must function normally when exposed to 150 percent of the maximum external soil and hydrostatic pressure.
The overall basin capacity shall be 237 Gallons. The basin shall incorporate a tapered bottom to minimize the retained volume and shall be designed to fit into most septic tanks after removal of the septic tank cover. The largest diameter must be no less that 50”. The height shall not exceed 55 inches for a station with lateral venting and a flat cover or 93 inches for a station with a shroud and domed cover. The low profile domed cover assembly shall be lockable and have watertight capabilities.
The tank shall be furnished with one EPDM grommet fitting to accept a 4.50" OD DWV or schedule 40 pipe. Tank capacities shall be as shown on the contract drawings.
2.06 DISCHARGE HOSE AND DISCONNECT/VALVE: All discharge fittings and piping shall be constructed of 304 Series stainless steel, polypropylene, EPDM or PVC. The discharge hose assembly shall include a shut-off valve rated for 200 psi WOG and a quick disconnect feature to simplify installation and pump removal. The stainless steel bulkhead penetration shall be factory installed and warranted by the manufacturer to be watertight.
2.07 ELECTRICAL QUICK DISCONNECT: The grinder pump unit shall include a single NEMA 6P electrical quick disconnect (EQD) for all power and control functions. An integral tube shall allow venting of the control compartment to assure proper operation of the pressure switch level system. The grinder pump will be furnished with a length of 6-conductor, 14-gauge, type-SJOW cable, pre-wired and watertight to meet UL requirements.
2.08 ANTI-SIPHON VALVE: The pump discharge shall be equipped with a factory-installed, gravity-operated, flapper-type integral anti-siphon valve built into the discharge assembly. Moving parts will be made of 300 series stainless steel and fabric-reinforced synthetic elastomer to ensure corrosion resistance, dimensional stability, and fatigue strength. A nonmetallic hinge shall be an integral part of the flapper assembly, providing a maximum degree of freedom to ensure proper operation even at a very low pressure. The valve body shall be injection-molded from a glass-filled thermoplastic resin. Holes or ports in the discharge piping are not acceptable anti-siphon devices, due to their tendency to clog from the solids in the slurry being pumped.
2.09 CHECK VALVE: The pump discharge shall be equipped with a factory installed, gravity operated, flapper-type integral check valve built into the discharge assembly. The check valve will provide a full-ported passageway when open, and shall introduce a friction loss of less than 6 inches of water at maximum rated flow. Moving parts will be made of a 300 series stainless steel and fabric reinforced synthetic elastomer to ensure corrosion resistance, dimensional stability, and fatigue strength. A nonmetallic hinge shall be an integral part of the flapper assembly providing a maximum degree of freedom to assure seating even at a very low back pressure. The valve body shall be an injection molded part made of glass filled PVC. Ball-type check valves are unacceptable due to their limited sealing capacity in slurry applications.
Each grinder pump installation shall also include one separate check valve of the type detailed in this section for installation in the 1 1/4" service lateral between the grinder pump station and the sewer main, preferably next to the curb stop. The separate check valve shall be provided as a separate line item in the bid schedule
2.10 CORE UNIT: The grinder pump station shall have an easily removable core assembly containing pump, motor, grinder, all motor controls, check valve, anti-siphon valve, electrical quick disconnect and wiring. The watertight integrity of the core unit shall be established by 100% factory test at a minimum of 5 PSIG.
2.11 CONTROLS: All necessary controls, including motor and level controls, shall be located in the top housing of the core unit. The top housing will be attached with stainless steel fasteners.
Non-fouling wastewater level controls for controlling pump operation shall be accomplished by monitoring the pressure changes in an integral air column connected to a pressure switch. The level detection device shall have no moving parts in direct contact with the wastewater. High-level sensing will be accomplished in the manner detailed above by a separate air-bell sensor and pressure switch of the same type. Closure of the high-level sensing device will energize an alarm circuit as well as a redundant pump-on circuit. For increased reliability, pump ON/OFF and high-level alarm functions shall not be controlled by the same switch. Float switches of any kind, including float trees, will not be accepted due to the periodic need to maintain (rinsing, cleaning) such devices.
To assure reliable operation of the pressure switches, each core shall be equipped with a breather assembly, complete with a suitable means to prevent accidental entry of water into the motor compartment. The grinder pump will be furnished with a 6 conductor, 14 gauge, type SJOW cable, pre-wired and watertight to meet UL requirements with a FACTORY-INSTALLED NEMA 6P EQD half attached to it.
2.12 ALARM PANEL: Each grinder pump station shall include a NEMA 4X, UL-listed ALARM PANEL suitable for wall mounting. The NEMA 4X enclosure shall be manufactured of thermoplastic polyester to ensure corrosion resistance. The enclosure shall include a hinged, lockable cover, pad lock, and secured dead front. The enclosure shall not exceed 10.50"W x14.00"H x 7.00"D.
For each core, the panel shall contain one (1) 15-amp, double-pole circuit breaker for the power circuit and one (1) 15-amp, single-pole circuit breaker for the alarm circuit. The panel shall contain terminal blocks, integral power bus, push to run feature and a complete alarm circuit.
The Alarm Panel shall include the following features: audio & visual alarm, push to run switch, and high level (redundant) pump starting control. The alarm sequence is to be as follows:
1. When liquid level in the sewage wet-well rises above the alarm level, visual and audio alarms will be activated. The contacts on the alarm pressure switch will close. The redundant pump starting system will be energized.
2. The audio alarm may be silenced by means of the externally mounted, push-to-silence button.
3. Visual alarm remains illuminated until the sewage level in the wet-well drops below the “off” setting of the alarm pressure switch.
The visual alarm lamp shall be inside a red oblong lens at least 3.75"L x 2.38”W x 1.50”H. Visual alarm shall be mounted to the top of the enclosure in such a manner as to maintain NEMA 4X rating.
The audio alarm shall be externally mounted on the bottom of the enclosure, capable of 93Db @ 2 feet. The audio alarm shall be capable of being deactivated by depressing a push-type switch which is encapsulated in a weatherproof silicone boot and mounted on the bottom of the enclosure.
The entire Alarm Panel as manufactured shall be listed by Underwriters Laboratories, Inc.
2.13 SERVICEABILITY: The grinder pump core unit shall have two lifting hooks, complete with nylon lift-out harness, to facilitate easy core removal when necessary. All mechanical and electrical connections must provide easy disconnect capability for core unit removal and installation. A push to run feature will be provided for field trouble shooting. All motor control components shall be mounted on a readily replaceable bracket for ease of field service.
2.14 OSHA CONFINED SPACE: All maintenance tasks for the grinder pump station must be possible without entry into the grinder pump station (as per OSHA 1910.146 Permit-required confined spaces). “Entry means the action by which a person passes through an opening into a permit-required confined space. Entry includes ensuing work activities in that space and is considered to have occurred as soon as any part of the entrant’s body breaks the plane of an opening into the space.”
2.15 SAFETY: The grinder pump shall be free from electrical and fire hazards as required in a residential environment. As evidence of compliance with this requirement, the completely assembled and wired grinder pump station in its tank shall be listed by Underwriters Laboratories, Inc., to be safe and appropriate for the intended use. UL listing of components of the station or third-party testing to UL standard will not be accepted.
The grinder pump shall meet accepted standards for plumbing equipment for use in or near residences, shall be free from objectionable noise, odor, or health hazards, and shall have been tested by an independent laboratory to certify its capability to perform as specified in either individual or low pressure sewer system applications.
3.0 EXECUTION
3.01 FACTORY TEST: Each grinder pump shall be submerged and operated for 5 minutes (minimum). Included in this procedure will be the testing of all ancillary components such as, the anti-siphon valve, check valve, discharge line and each unit’s dedicated level and motor controls. All factory tests shall incorporate each of the above listed items. Actual appurtenances and controls which will be installed in the field shall be particular to the tested pump only. A common set of appurtenances and controls for all pumps will not be acceptable. Certified test results shall be available upon request showing the operation of each grinder pump at two (2) different points on its curve, with the maximum pressure no less than 60 psi. The ENGINEER reserves the right to inspect such testing procedures with representatives of the OWNER, at the GRINDER PUMP MANUFACTURER’S facility.
Completed basins shall be factory leak tested to assure the integrity of all joints, seams and penetrations.
3.02 DELIVERY: All grinder pump units will be delivered to the job site, 100% completely assembled, including testing, ready for installation. Grinder pump cores will be shipped in a separate container and are only required to be installed in the basin.
3.03 INSTALLATION: Earth excavation and backfill are specified under SITE WORK, but are also to be done as a part of the work under this section, including any necessary sheeting and bracing. The CONTRACTOR shall be responsible for handling ground water to provide a firm, dry subgrade for the structure, and shall guard against flotation or other damage resulting from general ground water or flooding. The grinder pump stations shall not be set into the excavation until the installation procedures and excavation have been approved by the ENGINEER.
Remove packing material. User instructions MUST be given to the OWNER. Hardware supplied with the unit, if required, will be used at installation. The basin will be supplied with a standard field-installed 4" inlet grommet that will accept a 4.50" OD DWV pipe for connecting the incoming sewer line. Appropriate inlet piping must be used. The basin may not be dropped, rolled or laid on its side for any reason.
Installation shall be accomplished so that 1" to 4" of accessway, below the bottom of the lid, extends above the finished grade line. The finished grade shall slope away from the unit. The diameter of the hole must be large enough to allow for the concrete anchor.
A layer of naturally rounded aggregate, 6 inches minimum, clean and free flowing, with particle size of not less than 1/8" or more than 3/4" shall be used as bedding material under each unit (this may not be required when installing in an existing septic tank). A concrete anti-flotation collar, as detailed on the drawings, and sized according to the manufacturer’s instructions, shall be required and shall be precast to the grinder pump or poured in place. Each grinder pump station with its precast anti-flotation collar shall have a minimum of three (3) lifting eyes for loading and unloading purposes. The unit shall be leveled, and filled with water, to the bottom of the inlet, to help prevent the unit from shifting while the concrete is being poured and set. The concrete must be manually vibrated to ensure there are no voids. If it is necessary to pour the concrete to a level higher than the inlet piping, an 8" sleeve is required over the inlet prior to the concrete being poured.
The CONTRACTOR will provide and install a four (4) foot piece of four inch SCH 40 PVC pipe with cap, to stub-out the inlet for the property owners’ installation contractor, as depicted on the contract drawings.
The electrical enclosure shall be furnished, installed and wired to the grinder pump station by the CONTRACTOR. An alarm device is required on every installation, there shall be NO EXCEPTIONS. It will be the responsibility of the CONTRACTOR and the ENGINEER to coordinate with the individual property owner(s) to determine the optimum location for the Alarm Panel.
The CONTRACTOR shall mount the alarm device in a conspicuous location, as per national and local codes. The Alarm Panel will be connected to the grinder pump station by a length of 6-conduc